경로

플래너

기능

업데이트

App

로그인 또는 가입

앱 다운로드

로그인 또는 가입

디스커버
Places to see
리히텐슈타인

리히텐슈타인 비넨카날

디스커버
Places to see
리히텐슈타인

리히텐슈타인 비넨카날

리히텐슈타인 비넨카날

64명 중 56명이 추천함

저장

공유

  • 더보기

  • 저장

    공유

  • 더보기

  • 목적지로 설정

    여기 경로

    최고의 리히텐슈타인 비넨카날 자전거 투어 경로

    4.6

    (37)

    438

    자전거 타는 사람

    1. Altach에서 출발하는 일슈피츠 다리 – 라인강 일스피츠 하구 순환 코스

    58.3km

    03:18

    100m

    100m

    중급용 자전거 라이딩. 좋은 체력 필요. 대부분 포장된 지면. 실력과 관계없이 누구나 갈 수 있음.

    탐색하기

    휴대폰으로 전송

    중급

    중급용 자전거 라이딩. 좋은 체력 필요. 대부분 포장된 지면. 실력과 관계없이 누구나 갈 수 있음.

    중급

    중급용 자전거 라이딩. 좋은 체력 필요. 대부분 포장된 지면. 실력과 관계없이 누구나 갈 수 있음.

    중급

    4월 5, 2023

    inland canal

    Artificial body of water built in 1931-43 to drain the Liechtenstein valley. The inland canal crosses Liechtenstein over a length of 24.67 km in a south-north direction. Its catchment area covers 117 km2; In addition, water from the Samina valley is supplied via the Samina plant (approx. 1.5 m3/s).

    The reason for the construction was the increasing waterlogging of the valley floor since the 18th century and the restricted outflow of the streams into the Rhine as a result of the rising Rhine bed. From 1834, a canal was built in the Ried between Schaan and Bendern (up to the Esche estuary) as a forerunner of the later inland canal. However, there was no permanent drainage and unhindered outflow of the Rhine feeder. In 1894, the state parliament first discussed the idea of an inland canal that would flow through the whole of Liechtenstein. After the preparation of six reports, the project based on the work of Philipp Krapf, Felix Nesper, Jost Wey and Arnold Fussenegger was implemented by state engineer Josef Vogt.

    The construction of the inland canal was accepted by the state parliament on July 7, 1930 (with one dissenting vote) and after a referendum by the municipalities of Balzers, Triesen and Triesenberg on December 14, 1930 in a referendum (1469 yes, 616 no). The function of the canal construction as emergency work (→ job creation) was decisive for the clear assumption, which is considered an act of solidarity between the Oberland and the Unterland, which was particularly affected by the swamp, between workers and farmers and between the parties. The construction took place in stages. At the same time, some streams were regulated and several canals were created. The immense total costs of the inland canal, completed on April 3, 1943, amounted to CHF 4.6 million.

    The construction of the inland canal is considered a work of the century. It enabled the final and permanent drainage of the Liechtenstein valley area and thus its intensive agricultural use and settlement. The valley water system and its ecological characteristics have been fundamentally changed (→water bodies). With the exception of the Ruggeller Mölibach (introduction to the Spiersbach), all former Rhine tributaries now flow into the inland canal, which is the only remaining connection to the main body of water in Liechtenstein. In 2000, the natural redesign of the inland canal confluence with the Rhine took place.

    Text / Source: Historical Encyclopedia of the Principality of Liechtenstein

    historisches-lexikon.li/Binnenkanal

    번역자 Google •

      5월 24, 2025

      You can also cycle along this one

      번역자 Google •

        나만 알고 있는 정보가 있다면 로그인하여 다른 모험가에게 도움이 될 만한 팁을 추가해보세요!

        무료 회원 가입

        세부정보

        정보

        고도 500 m

        날씨

        AerisWeather 제공

        오늘

        목요일 9 10월

        14°C

        10°C

        0 %

        지금 활동을 시작하면...

        최고 풍속: 5.0 km/h

        가장 많이 방문한 시기

        1월

        2월

        3월

        4월

        5월

        6월

        7월

        8월

        9월

        10월

        11월

        12월

        살펴봐야 할 유명한 장소

        탐험하기
        ルート경로 플래너기능하이킹MTB 트레일로드 사이클링 경로바이크패킹
        앱 다운로드
        소셜 미디어에서 팔로우하기

        © komoot GmbH

        개인 정보 보호 정책