경로

플래너

기능

업데이트

App

로그인 또는 가입

앱 다운로드

로그인 또는 가입

디스커버
Places to see
폴란드
Szczecin
Szczecin

츠워비 다리

츠워비 다리

31명 중 29명이 추천함

저장

공유

  • 더보기

  • 저장

    공유

  • 더보기

  • 목적지로 설정

    여기 경로

    최고의 츠워비 다리 로드 사이클링 라이딩

    4.0

    (4)

    83

    자전거 타는 사람

    1. Osiedle Zachodnie에서 출발하는 츠워비 다리 – 흐로브리 제방 분수 순환 코스

    19.9km

    00:51

    60m

    60m

    초급용 로드 라이딩. 모든 체력 수준에 적합. 지면 대부분이 잘 포장되어 있고 라이딩하기 쉬움.

    탐색하기

    휴대폰으로 전송

    초급

    초급용 로드 라이딩. 모든 체력 수준에 적합. 지면 대부분이 잘 포장되어 있고 라이딩하기 쉬움.

    초급

    초급용 로드 라이딩. 모든 체력 수준에 적합. 지면 대부분이 잘 포장되어 있고 라이딩하기 쉬움.

    초급

    9월 27, 2023

    Nice view of the harbor

    번역자 Google •

      1월 27, 2023

      In the Middle Ages, in the place of today's bridge, there was a place where tolls were collected from passing ships and passing carts, and customs duties were collected on goods.
      In 1909, the German authorities of the city decided to build a drawbridge. Construction took 3 years. The designer of the then bridge was construction counselor Benduch. It was blown up by retreating German troops at the end of World War II, in the spring of 1945.
      After the war, in 1947, a temporary Bailey bridge was built on the site of the demolished structure. It stood on wooden supports and was not very resistant to excessive use. In 1954, the city authorities decided to build a new bridge. It was designed by: Eng. Maksymilian Wolff, Eng. arch. Janusz Sapiński, engineer Piotr Kołodko and technician Eugeniusz Szymański. Construction began in 1955 and was completed on April 23, 1960. The bridge had a post-tensioned concrete structure.
      In 1994, the bridge was renovated.
      Another renovation (this time of the middle span that had not been renovated since launch) began at the end of November 2008.
      On May 30, 2016, due to the poor technical condition of the bridge, the lane towards Dąbie was closed. On June 14, it was announced that the entire supporting structure of the bridge would be replaced. On June 15, at 11:15 p.m., due to the deteriorating technical condition, the crossing was completely closed[2]. In 2017 it was completely demolished; only the pillars and abutments were left and were used for the new steel supporting structure of the facility. In the second half of May 2017, assembly began. The new bridge consists of two steel segments with dimensions of 14x100 m. The assembly was carried out using hydraulic actuators and consisted of sliding onto the existing pillars and temporary supports located on the mainland. The span moved at a speed of three meters per hour. The operation was completed after several hours. The bridge was reopened on August 3, 2017.

      번역자 Google •

        나만 알고 있는 정보가 있다면 로그인하여 다른 모험가에게 도움이 될 만한 팁을 추가해보세요!

        무료 회원 가입

        세부정보

        날씨

        AerisWeather 제공

        오늘

        일요일 19 10월

        9°C

        3°C

        0 %

        지금 활동을 시작하면...

        최고 풍속: 2.0 km/h

        가장 많이 방문한 시기

        1월

        2월

        3월

        4월

        5월

        6월

        7월

        8월

        9월

        10월

        11월

        12월

        Loading

        위치:Szczecin, Szczecin, 폴란드

        살펴봐야 할 유명한 장소

        탐험하기
        ルート경로 플래너기능하이킹MTB 트레일로드 사이클링 경로바이크패킹
        앱 다운로드
        소셜 미디어에서 팔로우하기

        © komoot GmbH

        개인 정보 보호 정책