경로

플래너

기능

업데이트

App

로그인 또는 가입

앱 다운로드

로그인 또는 가입

디스커버
Places to see

Lakes

슬로바키아
트르나바

Gabčíkovo 저수지

하이라이트 • 호수

Gabčíkovo 저수지

31명 중 25명이 추천함

저장

공유

  • 더보기

  • 저장

    공유

  • 더보기

  • 목적지로 설정

    여기 경로

    최고의 Gabčíkovo 저수지 자전거 투어 경로

    4.7

    (30)

    244

    자전거 타는 사람

    1. Rovinka에서 출발하는 도나우 강변 도로 – 댐으로 막힌 도나우 순환 코스

    76.9km

    04:19

    70m

    70m

    보통 자전거 타기. 좋은 체력 필요. 대부분 포장된 지면. 실력과 관계없이 누구나 갈 수 있음.

    탐색하기

    휴대폰으로 전송

    보통

    보통 자전거 타기. 좋은 체력 필요. 대부분 포장된 지면. 실력과 관계없이 누구나 갈 수 있음.

    보통

    초급용 자전거 라이딩. 모든 체력 수준에 적합. 대부분 포장된 지면. 실력과 관계없이 누구나 갈 수 있음.

    초급

    9월 17, 2022

    The Gabčíkovo power plant is a run-of-river power plant in Slovakia at river kilometer 1836 and uses the hydroelectric power of the Danube. It is the largest hydroelectric power plant in Slovakia and generates around 11% of the national electricity requirement.
    As early as 1947 Stalin wanted to make the shallow alluvial plain between Győr and Bratislava navigable all year round. A canal was intended to enable Soviet warships to reach the borders of what was then the Eastern Bloc. In the 1950s, the first plans were drawn up but never realised.


    After major floods in the area in the 1950s and 1960s, particularly in 1954 and 1965, Hungary and Czechoslovakia signed an agreement on September 16, 1977 to build the Gabčíkovo–Nagymaros barrage system, the so-called “Budapest Agreement”. A large power plant was planned in Gabčíkovo, shortly before that an approximately 60 km² Dunakiliti-Hrušov reservoir and a second smaller one around 120 km downstream in the Hungarian city of Nagymaros (as an equalizing reservoir) on the Danube bend. This would have required 200 km of canalization or diking of the Danube. The construction costs should be borne equally by both states. Since the majority of the objects to be built were located on Czechoslovak territory, Hungary undertook to build Czechoslovak objects named in the agreement at its own expense. The electrical energy generated should also be shared equally.[1] According to the original agreement, the works were to be fully completed by 1991, with full commissioning of the Gabčíkovo power plant expected in 1989 and the Nagymaros power plant a year later.
    As early as 1981, the Hungarian government wanted to suspend the project for financial reasons, and in 1983 Czechoslovakia and Hungary agreed to extend the work by four years. In 1984, Hungarian environmentalists (Duna Kör) reinforced their ecological concerns about this mammoth project with a signature campaign. Concerns about drinking water and the existence of the riparian forests in particular played a major role. After the end of the Kádár government in 1988, the new government stopped all work in Hungary in May 1989 without giving a reason after a scientific study of the ecological consequences of the project, after only three months earlier it had signed a protocol to accelerate construction. By that time, 85 to 90 percent of the work on the Czechoslovak side had already been completed. On October 31, the Hungarian Parliament decided to halt work on the Nagymaros power plant and gave the government powers to negotiate an amendment to the 1977 Budapest Agreement.
    In 1993 both countries agreed to appeal to the International Court of Justice in The Hague. On September 25, 1997, the Court ruled that both countries had breached their legal obligations, Hungary in almost every point of the treaty. Czechoslovakia (later Slovakia) had the right to complete the construction but not to put it into operation. The original contract continues to apply and both countries should negotiate a new, more environmentally friendly solution. In its decision, the ICJ held that the agreement concluded between Hungary and Czechoslovakia was a treaty with territorial ties. For such a treaty, it follows from customary international law that a successor state must take over the treaties of the territorial predecessor. Slovakia is therefore bound by the former treaty between Czechoslovakia and Hungary. To settle the dispute, representatives of both governments agreed on a framework agreement in March 1998. To date, no real agreement has been reached, which has strained relations between Hungary and Slovakia for years.[7] In June 2017, a representative of the Slovak government sent an application to the ICJ to end the proceedings, which had been ongoing since 1998, for an additional decision. The Hungarian side stated in July 2017 that they did not oppose the Slovak request.

    번역자 Google •

      8월 16, 2024

      Dams the Danube to form a small sea. Impressive.

      번역자 Google •

        나만 알고 있는 정보가 있다면 로그인하여 다른 모험가에게 도움이 될 만한 팁을 추가해보세요!

        무료 회원 가입

        세부정보

        정보

        고도 120 m

        날씨

        AerisWeather 제공

        오늘

        화요일 25 11월

        5°C

        2°C

        100 %

        지금 활동을 시작하면...

        최고 풍속: 5.0 km/h

        가장 많이 방문한 시기

        1월

        2월

        3월

        4월

        5월

        6월

        7월

        8월

        9월

        10월

        11월

        12월

        Loading

        위치:트르나바, 슬로바키아

        살펴봐야 할 유명한 장소

        Fähre Vojka / Kyselica

        탐험하기
        ルート경로 플래너기능하이킹MTB 트레일로드 사이클링 경로바이크패킹
        앱 다운로드
        소셜 미디어에서 팔로우하기

        © komoot GmbH

        개인 정보 보호 정책