경로

플래너

기능

업데이트

App

로그인 또는 가입

앱 다운로드

로그인 또는 가입

디스커버
Places to see
독일
바이에른
스와비아
알고이

Keselstraße 수력 발전소

하이라이트 • 구조물

Keselstraße 수력 발전소

133명 중 122명이 추천함

저장

공유

  • 더보기

  • 저장

    공유

  • 더보기

  • 목적지로 설정

    여기 경로

    최고의 Keselstraße 수력 발전소 산악자전거 라이딩 경로

    4.7

    (66)

    288

    자전거 타는 사람

    1. Kempten (Allgäu) Ost에서 출발하는 알테 잘츠슈트라세 트레일 – 일러 자전거길 순환 코스

    47.5km

    03:34

    520m

    520m

    보통 산악 자전거 타기. 좋은 체력 필요. 뛰어난 라이딩 실력이 필요함.

    탐색하기

    휴대폰으로 전송

    보통

    보통 산악 자전거 타기. 좋은 체력 필요. 실력과 관계없이 누구나 갈 수 있음.

    보통

    보통 산악 자전거 타기. 좋은 체력 필요. 실력과 관계없이 누구나 갈 수 있음.

    보통

    7월 16, 2018

    The hydropower plant Keselstraße is a run-of-river power plant of the Allgäuer Überlandwerk in Kempten (Allgäu). It is powered by the water power of the Iller, on whose left bank the work stands.
    At the beginning of November 2007, work started on the construction of the new run-of-river power plant on Keselstrasse. The old building from 1958 was completely demolished and a new construction was built. The investment costs amounted to around 15 million euros.
    On the 11th of December 2009 the turning festival took place in the power plant. Next to the power plant are the old and listed buildings made of brick, in which up to the middle of the 20th century the mechanical cotton spinning mill and weaving mill Kempten had its production.
    The turbines were supplied by the company Andritz Hydro. The two Kaplan turbines have a diameter of 2.35 meters each and are seven meters high. A total of 12,000 cubic meters of concrete and 770 tons of steel were used for the construction. Problems with the construction resulted in the Baugrubensicherung. The airy rock had to be secured with nails up to 12 meters long. The building is 20 meters high, 100 meters long and 23 meters wide.
    Every year, 10.5 million kilowatt hours of electrical energy are produced and around 3,000 households are supplied. It has a nominal flow of 64 cubic meters per second. About 5,400 tons of CO₂ are saved each year.
    The power plant has a 76 meter long cascade fish staircase that surmounts a height of 5.1 meters. To improve the fish protection also contributes to a 80 m² fine screen. This has a distance of 3 centimeters in the horizontal rake bars.
    Since completion in July 2010, the turbine building is called a frozen wave, glacier tongue or star-shaped polished boulder. The power plant owner allows regular visits through the entire facility.
    In 2010, the hydropower plant received the pbb Architekturpreis 2010 award: this is a nationwide architectural prize for "exemplary commercial buildings". It should be a milestone in the field of regenerative energy through its extraordinary and independent architectural language as well as the urban integration.
    In 2011, the architecture of the power plant was awarded the German Architecture Prize for Concrete.
    Source: Wikipedia
    de.wikipedia.org/wiki/Wasserkraftwerk_Keselstra%C3%9Fe

    번역자 Google •

      6월 11, 2020

      Great view from the bridge!

      번역자 Google •

        7월 25, 2022

        MTB is really fun here

        번역자 Google •

          나만 알고 있는 정보가 있다면 로그인하여 다른 모험가에게 도움이 될 만한 팁을 추가해보세요!

          무료 회원 가입

          세부정보

          정보

          고도 710 m

          날씨

          Foreca 제공

          금요일 5 12월

          7°C

          -2°C

          13 %

          지금 활동을 시작하면...

          최고 풍속: 9.0 km/h

          가장 많이 방문한 시기

          1월

          2월

          3월

          4월

          5월

          6월

          7월

          8월

          9월

          10월

          11월

          12월

          Loading

          위치:알고이, 스와비아, 바이에른, 독일

          살펴봐야 할 유명한 장소

          Engelhalde Park Pond

          탐험하기
          ルート경로 플래너기능하이킹MTB 트레일로드 사이클링 경로바이크패킹
          앱 다운로드
          소셜 미디어에서 팔로우하기

          © komoot GmbH

          개인 정보 보호 정책