경로

플래너

기능

업데이트

App

로그인 또는 가입

앱 다운로드

로그인 또는 가입

디스커버
Places to see

세르비아

보이보디나

제젤리 다리

디스커버
Places to see

세르비아

보이보디나

제젤리 다리

제젤리 다리

9명이 추천한 장소입니다

로드 사이클리스트 9명이 추천

저장

공유

  • 더보기

  • 저장

    공유

  • 더보기

  • 목적지로 설정

    여기 경로

    최고의 제젤리 다리 로드 사이클링 라이딩

    4.0

    (6)

    156

    자전거 타는 사람

    1. Петроварадин에서 출발하는 바라딘 다리 – 제젤리 다리 순환 코스

    76.4km

    03:12

    130m

    중급용 로드 라이딩. 좋은 체력 필요. 투어 중 라이딩하기 어려운 비포장 구간이 있을 수 있음.

    탐색하기

    휴대폰으로 전송

    중급

    중급용 로드 라이딩. 좋은 체력 필요. 지면 대부분이 잘 포장되어 있고 라이딩하기 쉬움.

    중급

    중급용 로드 라이딩. 좋은 체력 필요. 지면 대부분이 잘 포장되어 있고 라이딩하기 쉬움.

    중급

    8월 3, 2021

    The original Zhezel Bridge (377 meters long) was over an arch bridge built between 1957 and 1961. It was designed by the eminent Yugoslav civil engineer Branko Zhezel and was constructed by Mostogradnja. It connected the urban area of ​​Novi Sad and Petrovaradin. During its existence, it served as part of an international railway line and as a transit route through Novi Sad.

    Original bridge damaged in 1999 (before complete destruction a few days later)

    During the NATO bombing of Yugoslavia, the bridge was bombed 12 times. On 23 April 1999, it was finally destroyed, disrupting rail transport between Belgrade and Subotica, ie [3]. During the NATO bombing, all three major bridges over the Danube in Novi Sad (Zhezel Bridge, Varadin Bridge and the Freedom Bridge) were completely destroyed.


    In 2000, a temporary Road-Railway Bridge was built near Zhezhel Bridge to serve as a replacement for Zhezhel Bridge until a new one was built. Over the years, the construction of the new Zhezel Bridge has been postponed several times.

    Construction work on the new bridge on the same site officially began in April 2012. The main designer of the new bridge was Alexander Bojovic, and the contractor was an international consortium, JV Azvi - Taddei - Horta Coslada. The new bridge is visually similar to the destroyed bridge, except that the arches are made of steel and not prestressed concrete. The bridge consists of two arches, the larger being 219 meters (719 feet) long and 42 meters (138 feet) high, and the smaller 177 meters (581 feet) long and 34 meters (112 feet) high. 7]

    In October 2017, the arches of Zhezel Bridge were connected after five years of construction and eighteen years after the demolition of the previous bridge. As of October 2017, the construction works amounted to EUR 51.71 million. The bridge was completed in April 2018 and regular rail transport was established. The transit of the vehicle was established on September 1, 2018. Encyclopedia site: bg.wikiqube.net

      나만 알고 있는 정보가 있다면 로그인하여 다른 모험가에게 도움이 될 만한 팁을 추가해보세요!

      무료 회원 가입

      세부정보

      정보

      고도 130 m

      날씨

      AerisWeather 제공

      오늘

      일요일 5 10월

      13°C

      9°C

      100 %

      지금 활동을 시작하면...

      최고 풍속: 13.0 km/h

      가장 많이 방문한 시기

      1월

      2월

      3월

      4월

      5월

      6월

      7월

      8월

      9월

      10월

      11월

      12월

      Loading

      위치:보이보디나, 세르비아

      살펴봐야 할 유명한 장소

      탐험하기
      ルート경로 플래너기능하이킹MTB 트레일로드 사이클링 경로바이크패킹
      앱 다운로드
      소셜 미디어에서 팔로우하기

      © komoot GmbH

      개인 정보 보호 정책