경로

플래너

기능

업데이트

App

로그인 또는 가입

앱 다운로드

로그인 또는 가입

디스커버
Places to see
독일
색스니 털실
미텔작센
홀자우

옛 노센–몰다바 철도 노선

하이라이트 • 자전거 도로

옛 노센–몰다바 철도 노선

107명 중 102명이 추천함

저장

공유

  • 더보기

  • 저장

    공유

  • 더보기

  • 목적지로 설정

    여기 경로

    최고의 옛 노센–몰다바 철도 노선 하이킹

    4.8

    (28)

    93

    등산객

    1. Holzhau에서 출발하는 몰다바 국경 검문소 – 김믈리츠 샘 순환 코스

    14.0km

    03:51

    230m

    230m

    보통 하이킹. 좋은 체력 필요. 실력과 관계없이 누구나 쉽게 갈 수 있는 길.

    탐색하기

    휴대폰으로 전송

    보통

    보통 하이킹. 좋은 체력 필요. 실력과 관계없이 누구나 쉽게 갈 수 있는 길.

    보통

    보통 하이킹. 좋은 체력 필요. 실력과 관계없이 누구나 쉽게 갈 수 있는 길.

    보통

    9월 28, 2021

    The Nossen – Moldava v Krušných horách railway is a branch line in Saxony that was originally built and operated as a main line by the Leipzig-Dresden Railway Company (LDE) as part of a supra-regional connection from central Saxony to Prague. The Royal Saxon State Railways carried them under the line abbreviation NM, which is the basis for the kilometering to this day. The section from Nossen via Freiberg to Holzhau is still in operation today. The further route to Moldava in the Czech Republic was shut down in sections between 1945 and 1972. The northern section from Nossen to Freiberg is also known as the Zellwaldbahn, the southern section from Freiberg to Holzhau is known as the Freiberger Muldentalbahn.

    번역자 Google •

      The decision to build the once continuous line Nossen Freiberg - Brüx is closely linked to the development in the south and north
      industry located in the central Erzgebirge. Around
      Freiberg and Chemnitz the demand for coal increased so much that it
      from the relatively low volume in the Zwickau - Oelsnitzer
      The hard coal mining area could not be fully covered. But there were sufficiently large quantities of brown coal stored in the Bohemian Basin near Teplitz, Dux and Brüx. But these were not available
      The Erzgebirge ridge was not yet accessible by railway
      The Leipzig - Dresden Railway Company took over on
      December 1, 1873, the construction of the connecting railway from Freiberg. Construction began on the Bohemian side around the same time.
      On November 2nd, 1875, the Freiberg-Mulda line (14.3 km) was put into operation and on August 16th, 1876 the opening of
      Mulda to Bienenmühle.
      In May 1884, the continuation of the construction of the railway from Bienenmühle to Moldova began.

      번역자 Google •

        The cross-border one
        The railway line opened on May 18, 1885.
        At the time of the heaviest traffic, 10 trains ran daily, pulled by 3
        Locomotives (leader and push locomotive), with 45 wagons, each with a loading weight of 10 tons or more.
        On May 8, 1945, train traffic between Moldava and Hermsdorf-Rehefeld was stopped.
        The last train was dispatched on Monday, February 7, 1972 at 3:14 p.m. Since then, trains have only run to Holzhau or Moldava.

        번역자 Google •

          나만 알고 있는 정보가 있다면 로그인하여 다른 모험가에게 도움이 될 만한 팁을 추가해보세요!

          무료 회원 가입

          세부정보

          정보

          고도 650 m

          날씨

          AerisWeather 제공

          오늘

          금요일 21 11월

          -3°C

          -6°C

          0 %

          지금 활동을 시작하면...

          최고 풍속: 4.0 km/h

          가장 많이 방문한 시기

          1월

          2월

          3월

          4월

          5월

          6월

          7월

          8월

          9월

          10월

          11월

          12월

          Loading

          위치:홀자우, 미텔작센, 색스니 털실, 독일

          살펴봐야 할 유명한 장소

          Wooden Bridge and Stream at Rear Fláje

          탐험하기
          ルート경로 플래너기능하이킹MTB 트레일로드 사이클링 경로바이크패킹
          앱 다운로드
          소셜 미디어에서 팔로우하기

          © komoot GmbH

          개인 정보 보호 정책