The construction of the port was in May 1938. In the spring of 1943, the work was stopped, with large parts, including 3 storage houses, the port railway system and the connection to the industrial railway PX were already completed. However, the connections to the Elster-Saale-Kanal and the Karl-Heine-Kanal were unfinished. The port was thus by 2015 not accessible by water.
The project envisaged two transshipment port basins, each 1000 meters long, 90 meters wide and six meters deep, and two industrial harbors north of the transhipment basins. 😊👊🏻
An industrial monument in the west of Leipzig, which never came to perfection. The stores have an impressive size. The construction work was discontinued in 1943. The connection of the Karl-Heine-Canal with the Elster-Saale-Canal is planned in the distant future.
앱과 웹사이트가 올바르게 작동하는 데 필수적인 쿠키를 사용하거나 집계된 통계를 생성하는 데 사용됩니다. 귀하의 동의에 따라, 저희와 저희의 제3자 파트너는 앱 내 및 내비게이션 경험을 개선하고 개인화된 서비스와 콘텐츠를 제공하기 위해 추적 기술을 사용할 것입니다. 동의를 주시려면 모든 쿠키 수락을 탭하세요.
대안으로, 개인 정보 설정을 사용자 정의하려면 사용자 정의 기본 설정을 탭하거나 언제든지 쿠키 기본 설정으로 이동할 수 있습니다. 비기술적 추적 기술을 사용하지 않기를 원하시면 거부를 탭하세요.
쿠키를 통해 귀하의 개인 데이터를 처리하는 방법에 대한 자세한 정보는 저희 개인정보 처리방침를 확인하세요.
저희는 귀하의 개인 정보를 소중히 여깁니다 ⛰️
앱과 웹사이트가 올바르게 작동하는 데 필수적인 쿠키를 사용하거나 집계된 통계를 생성하는 데 사용됩니다. 귀하의 동의에 따라, 저희와 저희의 제3자 파트너는 앱 내 및 내비게이션 경험을 개선하고 개인화된 서비스와 콘텐츠를 제공하기 위해 추적 기술을 사용할 것입니다. 동의를 주시려면 모든 쿠키 수락을 탭하세요.
대안으로, 개인 정보 설정을 사용자 정의하려면 사용자 정의 기본 설정을 탭하거나 언제든지 쿠키 기본 설정으로 이동할 수 있습니다. 비기술적 추적 기술을 사용하지 않기를 원하시면 거부를 탭하세요.
쿠키를 통해 귀하의 개인 데이터를 처리하는 방법에 대한 자세한 정보는 저희 개인정보 처리방침를 확인하세요.
경험을 공유해주실래요?
komoot에서 어떤 점이 도움이 되었는지 들려주세요. Trustpilot에 리뷰를 남겨주실래요?