경로

플래너

기능

업데이트

App

로그인 또는 가입

앱 다운로드

로그인 또는 가입

디스커버
Places to see
네덜란드
사우스 홀랜드
와딘스빈

Waddinxveen 리프트 브리지

하이라이트 • 다리

Waddinxveen 리프트 브리지

125명 중 104명이 추천함

저장

공유

  • 더보기

  • 저장

    공유

  • 더보기

  • 목적지로 설정

    여기 경로

    최고의 Waddinxveen 리프트 브리지 로드 사이클링 라이딩

    4.2

    (5)

    175

    자전거 타는 사람

    1. Gouda에서 출발하는 Waddinxveen 리프트 브리지 – Ziendeweg 순환 코스

    35.3km

    01:38

    40m

    40m

    초급용 로드 라이딩. 모든 체력 수준에 적합. 지면 대부분이 잘 포장되어 있고 라이딩하기 쉬움.

    탐색하기

    휴대폰으로 전송

    초급

    4.0

    (2)

    169

    자전거 타는 사람

    초급용 로드 라이딩. 모든 체력 수준에 적합. 지면 대부분이 잘 포장되어 있고 라이딩하기 쉬움.

    초급

    보통 도로 자전거 타기. 좋은 체력 필요. 지면 대부분이 잘 포장되어 있고 라이딩하기 쉬움.

    보통

    6월 7, 2020

    Major maintenance and renovation work was carried out in 2012, according to plan, for which the province of South Holland, together with the municipality of Waddinxveen, had earmarked 7.4 million euros. The bridge was closed to road traffic for five months. A ferry was available for cyclists and pedestrians. Shipping traffic was able to pass the bridge unhindered during that period. On September 1, 2012, the bridge was officially reopened by municipal and provincial authorities. According to the province, the bridge can last another fifteen years. [14]

    Since 1 September 2012, the bridge has been operated remotely by the Bridge control center in the Haakterpoort in Alphen aan den Rijn.

    On April 21, 2015, a collision took place by a pontoon pusher equipped with spud poles. The rear spud pole rammed the bridge and got stuck under the fall. A waiting cyclist was slightly injured by falling bolts and pavers.
    The bridge was severely damaged. The province of South Holland has even considered demolishing the lift bridge and replacing it with a new bridge. [15] However, when it became clear after research that the bridge could also be repaired, it was decided to restore and preserve the national monument. The recovery of the bridge took 7 months and cost almost 2 million euros. [16]
    Road traffic was diverted during that period. Cyclists and pedestrians were able to pass the Gouwe via a ferry.
    The collision was caused by the skipper's erroneous assumption that the lifting height was 15 meters. In reality it was 12 meters (the standard height), which was also indicated on the matrix board.


    In 2040, the vehicle lift will be more than 100 years old and at the end of its life. A report from the province of South Holland states that the Waddinxveen lift bridge must then be replaced, as well as the lift bridges in Boskoop and Alphen aan den Rijn that are about the same age.

    번역자 Google •

      6월 2, 2024

      Take your time when the lift bridge is up, look around you and enjoy all the beauty

      번역자 Google •

        나만 알고 있는 정보가 있다면 로그인하여 다른 모험가에게 도움이 될 만한 팁을 추가해보세요!

        무료 회원 가입

        세부정보

        정보

        고도 0 m

        날씨

        Foreca 제공

        목요일 18 12월

        13°C

        5°C

        88 %

        추가 날씨 팁

        최고 풍속: 18.0 km/h

        가장 많이 방문한 시기

        1월

        2월

        3월

        4월

        5월

        6월

        7월

        8월

        9월

        10월

        11월

        12월

        Loading

        위치:와딘스빈, 사우스 홀랜드, 네덜란드

        살펴봐야 할 유명한 장소

        Meanderende Weg Langs De Meije

        탐험하기
        ルート경로 플래너기능하이킹MTB 트레일로드 사이클링 경로바이크패킹
        앱 다운로드
        소셜 미디어에서 팔로우하기

        © komoot GmbH

        개인 정보 보호 정책