Along the Júcar canyon you can find the remains of the impressive hydroelectric work from the 50s. This water channeling work connects the Molinar dam and the Basta waterfall, where the water is released to produce energy.
This is the exit or entrance of the tunnel that is about three kilometers long. The doors at both ends are open and you have several vents along the route …