마지막 업데이트: 2월 22, 2026
Google 검색 결과에서 komoot을 선호하는 출처로 추가하세요.
지금 추가
하이라이트 • 구조물
번역자 Google •
팁에 의해
이런 장소를 발견하려면 지금 가입하세요
최고의 싱글 트랙, 봉우리 및 다양한 흥미로운 야외 장소에 대한 추천을 받아보세요.
무료 회원 가입
하이라이트 • 트레일
번역자 Google •
팁에 의해
무료로 가입하여 헤미켄 주변의 더 많은 협곡을 발견하세요.
무료 회원 가입
이미 komoot 계정이 있나요?
Google 검색 결과에서 komoot을 선호하는 출처로 추가하세요.
지금 추가
5월 5, 2025, Sommerau Valley
The Rünenberg Giessen is 18 meters high. The water cascades over a curved rock face onto a tuff cone.
1
0
4월 19, 2025, Steep Descent in Solothurn
The last time I came across this trail was by chance, in ice and snow. I fell on my backside a few times. This time we deliberately hiked uphill, and weather aside, it was far more pleasant.
0
0
12월 12, 2024, Rheinfelden Hydroelectric Power Plant
Beautiful power station, always nice to cross into Switzerland.😀👍
0
0
3월 31, 2024, Steep Descent in Solothurn
An extremely wild and romantic valley that requires good sure-footedness.
0
0
3월 31, 2024, Sommerau Valley
From the Sommerau to the Rünenberg and down to Giessen - a tour that never gets boring.
2
0
9월 17, 2023, Rheinfelden Hydroelectric Power Plant
Despite the power plant, the Rhine looks quite natural below
0
0
12월 13, 2022, Rheinfelden Hydroelectric Power Plant
One of the many hydroelectric power stations on the route.
1
0
10월 27, 2022, Rheinfelden Hydroelectric Power Plant
Power station with transition from Rheinfelden/Möhlin to Germany. Beautiful renaturation with a natural fish ladder
2
0
3월 27, 2022, Rheinfelden Hydroelectric Power Plant
Beautiful viewpoint, from Switzerland, of the power plant and D-Rheinfelden
2
0
4월 24, 2021, Rheinfelden Hydroelectric Power Plant
A wonderful circular route highlight is the old Rhine bridge and of course the old town of Rheinfelden Switzerland
0
0
4월 3, 2021, Rheinfelden Hydroelectric Power Plant
The view of the power plant is wonderful, the ascent is through a small gorge next to it.
0
0
6월 14, 2020, Rheinfelden Hydroelectric Power Plant
In April 1884, the canton of Aargau and in May 1895 the Grand Duchy of Baden granted the power plant operators at the time, now Energiedienst AG, the necessary concessions to operate a hydroelectric power plant on the Upper Rhine. This had a term of 90 years starting in 1898. In December 1989, the Swiss Federal Council and the Freiburg Regional Council approved new concessions for a further 80 years of power plant operation. One requirement stipulated that a new power plant with higher electricity production be built. Energiedienst began planning a hydroelectric power plant with an output of 100 megawatts. That is four times the output. Construction of the hydroelectric power plant in Rheinfelden began in the summer of 2003. The new dam was built by 2007. This was followed by the construction of the engine house. Electricity was produced for the first time in 2010. The official inauguration took place in 2011. With an annual production of 600 million kilowatt hours, the Rheinfelden hydroelectric power plant now supplies green electricity to around 170,000 households. This saves the environment around 300 million kilograms of carbon dioxide. In order to preserve the natural river landscape, Energiedienst also invested in ecological compensation measures. See also: https://www.energiedienst.de/produktion/wasserkraft/wasserkraftwerk-rheinfelden/ Source: www.energiedienst.de
2
0
9월 24, 2019, Grotten Trail
This singletrack is nice to go down. Upstairs and in the middle it has a few steps. Experienced bikers do not scare this. You can also start this trail. But it needs strong legs, or e-support.
0
0
9월 8, 2019, Talbachweg Trail
This forest path offers everything we bikers like. It is easy to drive on and not too steep. And the Talbach has partially washed out a real gorge. I love biking through ravines like this. In midsummer it is pleasantly cool there. Just a great trail.
0
0
이 지역에서 모든 것을 발견하셨나요? 다음 모험을 위해 헤미켄 주변의 추가 협곡을 확인해보세요:
무료로 가입하기