Covering an area of some 50 ha, the oval-shaped Titelberg plateau is approximately 1 km long (NW to SE) and 500 m wide. It was occupied continuously for 700 years …
Passable tunnel on the Audun-le-Tiche-Rédange railway line in the direct F / L border area. Built in 1880, last train in 1966. Then the tracks were dismantled.
“Each of these crosses can tell its own story and what motivated people to build “their” cross on this spot. (...) These crosses were erected as visible signs and attract …