アッテンドルンには必見のスポットがたくさんあります。ハイキング愛好家やサイクリング愛好家の方は、ぜひアッテンドルンを探索してこのエリアにある20
の隠れたスポットを訪れてみてください。このエリアの必見スポットを確認し、次の冒険に出かける計画を立てましょう。
最終更新日: 4月 7, 2026
ハイライト • 展望台
翻訳者 Google •
役立つ情報 は によるものです
ハイライト • ビーチ
翻訳者 Google •
役立つ情報 は によるものです
今すぐサインアップして、こんな場所を発見しよう
最高のシングルトラック、ピーク、その他のエキサイティングなアウトドアスポットのおすすめを受け取ろう。
無料新規登録
ハイライト (セグメント) • 湖
翻訳者 Google •
役立つ情報 は によるものです
ハイライト • 展望台
翻訳者 Google •
役立つ情報 は によるものです
無料アカウントで今日から始めよう
次の冒険が待っています。
ログインまたは登録
One of the most beautiful viewpoints of the Biggestausee. Two benches practically call for a short rest.
12
0
From mid-2007 to early 2009, the dam was completely renovated. Among other things, cracks and joints in the masonry had to be repaired, the roadway and railings had to be renewed and the arches of the flood relief had to be repaired. For the duration of the work, the top of the wall, the parking lot at the dam and the toilet facilities were closed to visitors. The renovation work, particularly on the railings and arches, has permanently changed the appearance of the dam.[8] In the years 2020 to 2022, the wall on the water side, which is stressed by the fluctuating water level, was renovated in three construction phases. In order to clear a four-meter-wide strip below the crown for work, the Lister Dam had to be lowered by 4.50 meters at a time. In this area, all joints could be chiseled out and loose stones could be anchored or replaced. After repointing and sandblasting, the character of the quarry stone masonry can be clearly seen again. A total of 30 kilometers of wall joints on both sides of the wall were treated in this way, which strengthened the Lister dam for decades to come.
18
0
The planning for the construction of the Listertalsperre goes back to the Ruhrtalsperreverein (RTV), founded in 1899, which had set itself the task of supplying water to the rapidly growing Ruhr area. Government master builder Ernst Link and construction director of the RTV had assessed the Listertal as particularly suitable when looking for other suitable locations for the construction of a dam. His report from 1905 was soon followed by the founding of the Lister Dam Cooperative, which tackled the construction of the dam with the financial support of the RTV. The ground-breaking ceremony took place on September 13, 1909, and almost three years later, on July 5, 1913, the ceremonial inauguration took place by director Kluge from Braunschweig, the head of the cooperative
17
0
まだ探しているハイライトが見つかりませんか?他の地域のトップアトラクションのガイドを見てみましょう:
無料でサインアップ