Tidslinje
Mark Boden var ude at cykle
I går kl. 07:59
Tid
Afstand
Hastighed
Stigning
Nedstigning
Mark Boden var ude at cykle
6. august 2026 kl. 07:25
Tid
Afstand
Hastighed
Stigning
Nedstigning
Mark Boden var ude at cykle
4. august 2026 kl. 07:56
Tid
Afstand
Hastighed
Stigning
Nedstigning
Mark Boden var ude at cykle
2. august 2026 kl. 06:51
Tid
Afstand
Hastighed
Stigning
Nedstigning
Mark Boden var ude at cykle
1. august 2026 kl. 09:38
Tid
Afstand
Hastighed
Stigning
Nedstigning
Mark Boden var ude at cykle
31. juli 2026 kl. 09:59
Hambleton Bakery
Two weeks off the bike… the things I do for kids 🫤, and not my kids!
Tid
Afstand
Hastighed
Stigning
Nedstigning
Mark Boden var på vandretur
28. juli 2026 kl. 01:24
Tid
Afstand
Hastighed
Mark Boden var på vandretur
26. juli 2026 kl. 00:45
Kota Kinabalu orientation walk with the World Challenge Ground Team.
First half of the walk was learning about some the history and its colonial past👍. Second half, by demand, was shopping in a mall 👎.
Tid
Afstand
Hastighed
Mark Boden var på vandretur
25. juli 2026 kl. 08:44
Tid
Afstand
Hastighed
Mark Boden var på vandretur
21. juli 2026 kl. 02:49
World Challenge - Bambangan Trail Trek day 1.
The team copped well with heavy bags and challenging terrain, steep ramps up and slippery slopes down. We arrived at Bambangan Camp in a heavy downpour. After setting up the hammocks, the rain continued and turned into a tropical rain storm. The site became a river and the horizontal rain…
Tid
Afstand
Hastighed
Lee Worker, Lucille M og Rosalind kan lide dette.
Mark Boden var på vandretur
23. juli 2026 kl. 01:23
Trek Day 3 - The Adventure centre to Kipumpun village.
After drying all our kit from the previous 2 days we took an easy walk to Kipumpun village for a cultural tour of the village.
A population of 350 residents who are totally self sufficient. This was a very enjoyable immersive cultural experience.
Tid
Afstand
Hastighed
Stefano Orsoni, Lee Worker og Rosalind kan lide dette.
Mark Boden var på vandretur
22. juli 2026 kl. 02:05
Bambangan Trail Trek Day 2 (abandoned)
After the continuous heavy rain all night we abandoned continuing with the planned 4 day trek. The conditions underfoot on the trail were deemed too challenging and potentially dangerous with heavy packs. After gathering all our soaking kit, cleaning up as best we could we made our way back the…
Tid
Afstand
Hastighed
Lee Worker og Rosalind kan lide dette.
Mark Boden var på vandretur
17. juli 2026 kl. 08:21
Tid
Afstand
Hastighed
Lee Worker, Rosalind og Miguel Mendes kan lide dette.
Mark Boden var på vandretur
17. juli 2026 kl. 00:38
World Challenge Borneo Trip
A wonder around the Sepilok Orangutan Rehabilitation Centre and the
Sun Bear (world’s smallest bear) Conservation Centre.
Tid
Afstand
Hastighed
Alison lord, Lee Worker og Rosalind kan lide dette.
Mark Boden var ude at cykle
12. juli 2026 kl. 06:52
Tid
Afstand
Hastighed
Stigning
Nedstigning
4 dage siden
UK, Nottingham. Dig? USA gætter jeg?
Viser oversættelse
Opret konto eller log ind for at fortsætte
Alt, du behøver for at komme ud
Klar inspiration
Gennemse personligt tilpassede eventyr, der passer til din foretrukne sport
Et bedre planlægningsværktøj
Skab din perfekte udendørsoplevelse med verdens bedste udendørsteknologi
Mere intuitiv navigation
Sving-for-sving-navigation og offlinekort holder dit eventyr på sporet
En log over alle dine eventyr
Gem alle dine eventyr og del dine oplevelser med dine venner