RuterPlanlæggerFunktionerOpdateringer
App
Log ind eller opret konto
Hent appen
Log ind eller opret konto

Koinseb

Følgere

0

Følger

0

Følg

Tidslinje

var på graveltur

12. oktober 2024 kl. 14:25

Second #Coffeeneuring ride of 2024

Tid

3h54m

Afstand

60,4km

Hastighed

15,5km/h

Stigning

50m

Nedstigning

30m

kan lide dette.

var på graveltur

6. oktober 2024 kl. 15:50

First #Coffeeneuring for 2024

Tid

2h30m

Afstand

43,0km

Hastighed

17,2km/h

Stigning

50m

Nedstigning

40m

kan lide dette.

var på cykeltur

12. november 2023 kl. 15:11

#04773 - Canton - Lake Erie Run

Tid

5h45m

Afstand

106km

Hastighed

18,5km/h

Stigning

120m

Nedstigning

120m

12. november 2023

It's Mid-November, yet still beautiful weather so I decided to ride another Permanent from RUSA (Randonneurs USA). The details for this route are here:

rusa.org/cgi-bin/permview_GF.pl?permid=4773

var på cykeltur

4. november 2023 kl. 14:41

Randonneur USA Permanent: #03164 - Frankfort - Sleeping Bear - Glen Arbor

Tid

5h49m

Afstand

103km

Hastighed

17,7km/h

Stigning

830m

Nedstigning

700m

5. november 2023

I did this Permanent Ride on a cold, windy (but sunny and beautiful) day in Early November. Even stopped for a Cappuccino in Glen Arbor, in the spirit of #Coffeeneuring😁☕

Here is the route for this ride on the Randonneurs USA website:

rusa.org/cgi-bin/permview_GF.pl?permid=3164

var på graveltur

2. maj 2021 kl. 15:27

The Fred Meijer Clinton-Ionia-Shiawassee Trail - Fowler to Western terminus

Tid

5h17m

Afstand

97,9km

Hastighed

20,5km/h

Stigning

540m

Nedstigning

540m

3. maj 2021

This is a tour of the Fred Meijer Clinton-Ionia-Shiawassee Trail, from Fowler to Ionia. This tour continues West on the "Fred Meijer Grand River Valley Trail" to just outside of downtown Lowell.

The trails ends in a very un-spectacular way about 1.5 miles from downtown Lowell by just merging onto the

var på graveltur

12. april 2021 kl. 21:19

Mike Levine Lakelands Trail State Park - Paved Section

Tid

1h48m

Afstand

32,5km

Hastighed

19,2km/h

Stigning

180m

Nedstigning

190m

14. april 2021

This section of the Mike Levine Lakelands Trail State Park (from the parking lot in Pinckney going East to its Terminus at US23) is entirely paved.

As is to be expected from a Rails-to-Trails park, it is almost entirely straight & flat. The only exception is shortly before the end, when the trail meanders around a prison.

var på graveltur

10. april 2021 kl. 13:45

Fred Meijer Clinton-Ionia-Shiawassee Trail from Owosso to Fowler

Tid

6h02m

Afstand

100km

Hastighed

18,8km/h

Stigning

610m

Nedstigning

610m

kan lide dette.