Road Closed to Vehicles – Acton Swing Bridge loop from Helsby
Road Closed to Vehicles – Acton Swing Bridge loop from Helsby
3
riders
02:19
36.7km
370m
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: October 16, 2025
Tips
Includes movable bridges
Check opening times.
2 in total
Waypoints
Start point
Train Station
Get Directions
624 m
Highlight • Structure
6.53 km
Highlight • Bridge
8.98 km
Chapel Wood
Forest
13.0 km
Highlight • Bridge
Tip by
18.5 km
Highlight • Bridge
Tip by
36.4 km
Highlight • Cafe
36.4 km
Highlight • Cafe
36.4 km
Highlight • Other
36.7 km
End point
Train Station
Way Types & Surfaces
Way Types
21.5 km
8.83 km
3.60 km
1.70 km
1.07 km
< 100 m
Surfaces
29.8 km
4.93 km
1.97 km
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by AerisWeather
Today
Friday 14 November
10°C
7°C
100 %
If you start your activity now...
Max wind speed: 25.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.