Discover

Canal Artwork – Reached the Summit Loop from Sowerby Bridge

Canal Artwork – Reached the Summit Loop from Sowerby Bridge

Intermediate
03:21
28.3 mi
8.4 mph
1,775 ft
1,775 ft
Intermediate mountain bike ride. Good fitness required. Advanced riding skills necessary. The starting point of the Tour is accessible with public transport.

Our Tour recommendations are based on thousands of activities completed by other people on komoot.

Waypoints

Sowerby BridgeGet Directions

Train Station
5.91 mi
10.3 mi
© OSM

Canal Artwork

Mountain Biking Highlight

13.8 mi
© OSM

Reached the Summit

Mountain Biking Highlight

17.1 mi
© OSM

excellent singletrack

Mountain Biking Highlight (Segment)

28.3 mi

Sowerby Bridge

Train Station

Map

Waytypes & Surfaces

Singletrack: 1.11 mi
Path: 7.64 mi
Access Road: 121 yd
Cycleway: 9.89 mi
Street: 1.32 mi
Road: 7.90 mi
State Road: 0.41 mi
Natural: 0.93 mi
Unpaved: 4.32 mi
Gravel: 8.28 mi
Paved: 6.04 mi
Asphalt: 5.92 mi
Unknown: 2.84 mi
  • Includes segments in which cycling is forbidden

    You will have to dismount and push your bike.

Tour Profile

Weather Forecast

Discover

Canal Artwork – Reached the Summit Loop from Sowerby Bridge