Ruter

Planlægger

Funktioner

Opdateringer

App

Log ind eller opret konto

Hent appen

Log ind eller opret konto

Opdag
Places to see
Amerikas Forenede Stater
Texas

Bowie County

New Boston

Northeast Texas Trail: T&P Trailhead Park to FM 3378

Opdag
Places to see
Amerikas Forenede Stater
Texas

Bowie County

New Boston

Northeast Texas Trail: T&P Trailhead Park to FM 3378

Highlight (segment) • Sti

Northeast Texas Trail: T&P Trailhead Park to FM 3378

Cykling

5.0

(1)

Gem

Del

  • Mere

  • Gem

    Del

  • Mere

  • Tag mig derhen

    Tips

    29. september 2023

    Cykling

    The Norteast Texas Trail runs 130 miles, following an old railroad route. The path is not paved everywhere and difficult to track. This section of the trail is maintained by the City of New Boston and very easily traveled by walkers and bikers alike. The short, paved section starts at the T&P Trailhead Park and ends at F.M 3378.

    Kender du stedet? Log ind for at tilføje et tip til andre eventyrere!

    Opret gratis konto

    Ruter i nærheden

    Bedste ruter nær Northeast Texas Trail: T&P Trailhead Park to FM 3378

    Detaljer

    Oplysninger

    Afstand 4,08 km

    Opstigning 10 m

    Nedstigning 10 m

    Vejr

    Drevet af Foreca

    mandag 23. marts

    25°C

    15°C

    -- %

    Flere vejrtips

    Maks. vindhastighed: -- km/h

    Loading

    Placering: New Boston, Bowie County, Texas, Amerikas Forenede Stater

    Andre populære steder, du kan udforske

    Fountain at Spring Lake Park

    Udforsk
    RuterRuteplanlæggerFunktionerVandretureMTB-stierLandevejsruterBikepackingSitemap
    Hent appen
    Følg os på sociale medier

    © komoot GmbH

    Fortrolighedspolitik